Used 2022 Genesis G70 2.0T Advanced Uyuni White

2022 Genesis G70 2.0T Advanced
2022 Genesis G70 2.0T Advanced
2022 Genesis G70 2.0T Advanced
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 1
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 2
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 3
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 4
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 5
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 6
2022 Genesis G70 2.0T Advanced Interior Shot 1
2022 Genesis G70 2.0T Advanced Interior Shot 2
2022 Genesis G70 2.0T Advanced Interior Shot 3
2022 Genesis G70 2.0T Advanced Interior Shot 4
2022 Genesis G70 2.0T Advanced Interior Shot 5
2022 Genesis G70 2.0T Advanced Interior Shot 6
2022 Genesis G70 2.0T Advanced Interior Shot 7
2022 Genesis G70 2.0T Advanced Interior Shot 8
2022 Genesis G70 2.0T Advanced Exterior Shot 1
2022 Genesis G70 2.0T Advanced Exterior Shot 2
2022 Genesis G70 2.0T Advanced Exterior Shot 3
2022 Genesis G70 2.0T Advanced Exterior Shot 4
2022 Genesis G70 2.0T Advanced Exterior Shot 5
2022 Genesis G70 2.0T Advanced Exterior Shot 6
2022 Genesis G70 2.0T Advanced Exterior Shot 7
2022 Genesis G70 2.0T Advanced Exterior Shot 8
2022 Genesis G70 2.0T Advanced Exterior Shot 9
2022 Genesis G70 2.0T Advanced Exterior Shot 10
2022 Genesis G70 2.0T Advanced
2022 Genesis G70 2.0T Advanced
2022 Genesis G70 2.0T Advanced
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 1
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 2
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 3
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 4
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 5
2022 Genesis G70 2.0T Advanced Uyuni White  Shot 6
2022 Genesis G70 2.0T Advanced Interior Shot 1
2022 Genesis G70 2.0T Advanced Interior Shot 2
2022 Genesis G70 2.0T Advanced Interior Shot 3
2022 Genesis G70 2.0T Advanced Interior Shot 4
2022 Genesis G70 2.0T Advanced Interior Shot 5
2022 Genesis G70 2.0T Advanced Interior Shot 6
2022 Genesis G70 2.0T Advanced Interior Shot 7
2022 Genesis G70 2.0T Advanced Interior Shot 8
2022 Genesis G70 2.0T Advanced Exterior Shot 1
2022 Genesis G70 2.0T Advanced Exterior Shot 2
2022 Genesis G70 2.0T Advanced Exterior Shot 3
2022 Genesis G70 2.0T Advanced Exterior Shot 4
2022 Genesis G70 2.0T Advanced Exterior Shot 5
2022 Genesis G70 2.0T Advanced Exterior Shot 6
2022 Genesis G70 2.0T Advanced Exterior Shot 7
2022 Genesis G70 2.0T Advanced Exterior Shot 8
2022 Genesis G70 2.0T Advanced Exterior Shot 9
2022 Genesis G70 2.0T Advanced Exterior Shot 10
Vehicle Test Drive Video
$34,599
Licensing and applicable taxes, CAD.
The 2022 Genesis G70 2.0T Advanced AWD in white is a refined sedan that combines all-wheel drive prowess with the smoothness of an automatic transmission. Perfect for those seeking a harmonious blend of performance and sophistication, this vehicle offers impressive handling to navigate any road with confidence. Step into a world of elegance with its black leather interior that exudes luxury. Outfitted with features like alloy wheels and a sunroof/moonroof, this sedan not only offers aesthetic appeal but also practical functionality. Enjoy an array of comfort-enhancing elements such as cooled and heated seats, leather steering wheel, and leatherette door trim inserts. Stay connected and protected with advanced technology including a navigation system, Bluetooth connection, and smart device integration. Safety and driver assistance features like lane assist, adaptive cruise control, brake assist, and parking sensors ensure a safe and stress-free driving experience for both driver and passengers. Ideal for professionals and families alike seeking a vehicle that epitomizes luxury and advanced features, the 2022 Genesis G70 is a testament to quality and attention to detail. Reach out to Genesis Ottawa today to schedule a test drive and experience this remarkable sedan for yourself.
STATUS: IN-STOCK
Year:2022Price:$34,599
Make:GenesisTrans:Automatic
Model:G70A/C:Yes
Trim:2.0T AdvancedEngine:2.0L GDI Turbo I4
Stock#:k1175Mileage:34692
VIN:KMTG34TA6NU088751
  • 2.0L GDI Turbo I4 engine
  • 8-Speed Automatic w/SHIFTRONIC transmission
  • 4-wheel anti-lock brakes (ABS)
  • integrated navigation system
  • side seat mounted airbags
  • curtain 1st and 2nd row overhead airbags
  • driver knee airbag
  • airbag occupancy sensor
  • automatic air conditioning
  • 18" aluminum wheels
  • cruise control
  • Smart Cruise Control w/Stop & Go adaptive
  • ABS and driveline traction control.
  • Auto-dimming door mirrors
  • Door mirrors: body-colour
  • Number of doors: 4
  • Rear cargo: trunk
  • Turn signal indicator mirrors
  • Bumpers: body-colour
  • Heated door mirrors
  • Power door mirrors
  • Tailpipe finisher: chrome
  • 1-touch down
  • Adaptive Cruise Control: Smart Cruise Control w/Stop & Go
  • Auto-dimming rearview mirror
  • Driver door bin
  • Emergency communication system: Genesis Connected Services (w/5-year complimentary subscription)
  • Front dual zone A/C
  • Heated steering wheel
  • Memory seat
  • Navigation system
  • Passenger door bin
  • Power moonroof
  • Proximity key: doors and push button start
  • Rear door bins
  • Remote keyless entry
  • Steering wheel memory
  • Tilt steering wheel
  • Auto high-beam headlights
  • Delay-off headlights
  • Front reading lights
  • Lane departure: Lane Following/Lane Keep Assist (LFA w.LKA) active
  • Outside temperature display
  • Rain sensing wipers
  • Rear window defroster
  • Tachometer
  • Variably intermittent wipers
  • Front seats: bucket
  • Heated rear seats
  • Max seating capacity: 5
  • Power driver seat
  • Rear seat centre armrest
  • Rear seats Folding position: fold forward seatback
  • Split folding rear seat
  • 1-touch up
  • Air conditioning
  • Automatic temperature control
  • Driver vanity mirror
  • Front beverage holders
  • Garage door transmitter: HomeLink
  • Illuminated entry
  • Moonroof sunshade: power
  • Overhead console
  • Passenger vanity mirror
  • Power windows
  • Rear beverage holders
  • Remote engine start: smart device only (subscription required)
  • Speed control
  • Telescoping steering wheel
  • Appearance: digital/analog
  • Blind spot: Blind-Spot Collision-Avoidance Assist (BCA-A) warning
  • Exterior parking camera rear
  • Fully automatic headlights
  • Low tire pressure warning
  • Parking sensors: Parking Distance Warning (PDW) front and rear
  • Rear reading lights
  • Speed sensitive wipers
  • Trip computer
  • Front centre armrest
  • Heated front seats
  • Leather upholstery
  • Power 4-way driver lumbar support
  • Power passenger seat
  • Rear seats: bench
  • Seat Upholstery: leather
  • Ventilated front seats
  • 1st row LCD monitors: 2
  • Internet access capable: Genesis Connected Services (w/5-year complimentary subscription)
  • Satellite radio trial duration with new vehicle purchase (months): 3
  • Speaker type: Lexicon
  • Steering wheel mounted audio controls
  • AM/FM radio: SiriusXM
  • Primary LCD size: 10.3"
  • Smart device integration: Android Auto & Apple CarPlay
  • Speakers: 15
  • Wireless phone connectivity: Bluetooth
  • Compressor: intercooled turbo
  • Drive type: all-wheel
  • Engine location: front
  • Fuel economy combined: 10.0L/100 km
  • Fuel tank capacity: 60.0L
  • Hybrid traction battery type: none
  • Mode select transmission
  • Recommended fuel: Premium Unleaded
  • Torque: 260 lb.-ft. @ 1,400RPM
  • Variable intake manifold
  • Cylinder configuration: I-4
  • Engine litres: 2.0L
  • Fuel economy city: 11.4L/100 km
  • Fuel economy highway: 8.2L/100 km
  • Horsepower: 252hp @ 6,200RPM
  • Manual-shift auto
  • Number of valves: 16
  • Standard fuel economy fuel type: gasoline
  • Transmission: 8 speed automatic
  • Variable valve control
  • 4 wheel disc brakes
  • Adjustable head restraints: driver and passenger w/tilt
  • Brake assist
  • Dual front side impact airbags
  • Forward collision: (FCA) Forward Collision-Avoidance Assist w/Pedestrian Detection/Junction Turning mitigation w/left turn assist
  • Ignition disable
  • Occupant sensing airbag
  • Panic alarm
  • Rear collision: Rear Cross-Traffic Collision Avoidance-Assist (RCCA) warning
  • Tracker system
  • ABS brakes
  • Anti-whiplash front head restraints
  • Dual front impact airbags
  • Electronic stability
  • Front pedestrian detection: prevention
  • Knee airbag
  • Overhead airbag
  • Perimeter/approach lights
  • Security system
  • Traction control
  • Compression ratio: 10.00 to 1
  • Engine bore x stroke: 86.0mm x 86.0mm (3.39" x 3.39")
  • Engine horsepower: 252hp @ 6,200RPM
  • Exterior body width: 1,850mm (72.8")
  • Exterior length: 4,685mm (184.4")
  • Front legroom: 1,083mm (42.6")
  • GVWR: 2,190kg (4,828lbs)
  • Interior rear cargo volume: 297 L (10 cu.ft.)
  • Rear headroom: 938mm (36.9")
  • Rear shoulder room: 1,387mm (54.6")
  • Wheelbase: 2,835mm (111.6")
  • Curb weight: 1,666kg (3,673lbs)
  • Engine displacement: 2.0 L
  • Engine torque: 260 lb.-ft. @ 1,400RPM
  • Exterior height: 1,400mm (55.1")
  • Front headroom: 978mm (38.5")
  • Front shoulder room: 1,430mm (56.3")
  • Interior maximum rear cargo volume: 297 L (10 cu.ft.)
  • Passenger volume: 2,656L (93.8 cu.ft.)
  • Rear legroom: 884mm (34.8")
  • Turning radius: 5.7m (18.7')
  • Alloy wheels
  • Front anti-roll bar
  • Power steering
  • Rear tires: 225/45WR18.0
  • Four wheel independent suspension
  • Front tires: 225/45WR18.0
  • Rear anti-roll bar
  • Wheel size: 18"
The Dilawri discount cannot be stacked with other dealer incentives. Prices may include cash incentives available to Canadian customers residing in the province of Ontario, for details about pricing available to customers outside of Ontario please contact us. Optional Dilawri Value Package $699 and $70 Carfax fee on new cars only, eligibility required, see dealer for details.